Looking at our contract backlog. Sea1 Offshore has a firm contract backlog of $756 million.
In addition, there are $589 million in options. And as you can see, the largest part of our backlog is related to our subsea fleet.
For the remaining part of 2025.
We have a firm backlog of about $112 million.
For 2025, we have 100% coverage for both the P3 fleet and the subsea fleet for 2026. We have 100% coverage for the subsea fleet and close to 50% for the anchor handler and WPS three PSV fleet. We are targeting more term work for the segment.
We see more and more term tenders in the market, and hopefully we will be in a position to conclude long-term contracts.
Our OSCV fleet consists of 16 owned vessels as listed on this slide. In addition, we have four vessels under construction and six vessels under technical and commercial management, and one more vessel will be added in late September. Sea1 Offshore now has two well intervention vessels.
We have two SVS. We have the scientific core drilling vessel. We have fast crew vessels and oil spill recovery vessels, totaling four, and we have six anchor handlers, and we have a new building programme of four construction vessels. And in addition, we operate six vessels under management on behalf of Viking Supply Ships. So let's look at our areas of operation as per today.
On this slide, we have listed all our fully owned vessels and vessels operated commercially and technically by us.
The company has, as mentioned before, a very good global footprint, which is important for the utilization of the fleet.
And we will continue to move vessels around the world where we can perform safe operations based on sustainable conditions for the anchor handler segments.
Uh, there are mainly short-term contracts and campaigns, and in Australia, we currently have the anchor handlers C1 Sapphire, C1 Aquamarine, C1 Emerald, and C1 Kingfisher.
They are all operating on term contracts. In Malaysia, we have C1 Amethyst and in Canada, we have Avalon C. Moving on to the construction vessel, we have C1 Dorado on a firm contract operating in Brazil, and the two well intervention vessels, CMLL X1 and CMLL X2 are both on long-term contracts, also working offshore Brazil.
We have two SVS in our fleet: C1 Atlas and CMN Joint. They are both on term contracts in Brazil, and for the smaller Brazilian fleet, we have the oil spill recovery vessels C1 Margo and C1 Monrovia. Go and see one more. This is both on term contracts with Petrobras. And then we have the fourth crew vessel C1 Pandu T-bar and C1 Piata. They are both on long-term bareboat agreements.
Then we have our core drilling vessel during Dis Resolution. The vessel has been in layup for some months, and we have decided to scrap that vessel as shown on the previous slide. We have a really good contract coverage for this year.
Just a few comments on the market. Then you note the anchor market was strong at the start of the quarter, with rates significantly higher than the previous two years. Spot demand declined in May and further into June, and we expect to see a spot market that will be weak for the remainder of this year for the construction support vessel market. Long-term demand fundamentals remain strong. With subsea backlogs from conventional EPICs at record highs in the short term.
However, we have observed decreased activity in the North Sea and a reduction in projects within deepwater regions.
The same activity in Australia is seeing a temporary decrease in 2025. In the short term, this is expected to result in more available support vessels in the region, putting pressure on rates and utilization with some migration of vessels to other regions.
Rig activity is expected to grow again during next year.
A limited further increase in OSV utilization is expected over the next years based on moderate demand growth and stable fleet numbers.
So to summarize, we delivered another strong quarter.
Sea1 Offshore continued to deliver first-class operation with excellent HQ performance.
We have a solid financial position.
We have a strong backlog with quality clients, and there is a positive long-term market outlook in all segments.
That was the end of the presentation, and we will now open up for questions.
So the first question we have here is about the possibility of a merger between Sea1 and Wiking. And that is something we cannot comment on. The next question received is how long will you have the joint resolution in Leo before exploring other options? Well, we have been exploring options for quite some time, and it's now decided that the vessel will be scrapped.