Good morning and welcome to Cavotec's third quarter presentation. I am David Pagels, the CEO of Cavotec, and together with me today I have, as usual, Joakim Wahlquist, Cavotec's CFO. I would like to start with a short introduction to Cavotec.
For those of you who are not familiar with us. Cavotec was founded 50 years ago by three entrepreneurs in Sweden.
Since its foundation, Cavotec has focused on developing technical solutions to improve efficiency and electrify processes in areas such as ports and other industries where electrical cable reels or radio remote controls are needed. As part of this global expansion, Cavotec moved to Switzerland in 2007.
This year, however, we have taken an important step by returning to our roots in Sweden.
These moves bring us closer to our shareholder base, which is in Sweden, and also enable us to become more efficient and agile. We're very excited about that.
As you know, we report two business segments. Our service offering is reported into those two segments. Port maritime provides world-leading solutions for ports, ships, and other marine applications. We have unique systems, for example, automated mooring and MoorMaster. We have shore power, crane electrification, as well as connections and charging systems. All these solutions contribute significantly to improving environments and working conditions in ports worldwide. Our customers include ship owners and operators, ports and terminals, port equipment manufacturers, and shipyards. Port maritime is our largest segment and represents the majority of the group's sales and EBITDA.
The industry segment is the other one, and its unique selling point is our ability to drive productivity and contribute to the customers' operations efficiency, electrification, as well as occupational health and safety. The products include motorized cable and hose reels, radio remote controls, power connectors, and spring-driven cable and hose reels. We have customers in a wide variety of industrial sectors such as cranes, energy processing, and transportation. Surface and underground mining and tunneling as a service, as I mentioned, is an integrated part of our business segments, and we have service engineers across the globe. They work either from our service centers or are based at our customers' premises. The service offering includes system integration, maintenance, sales of spare parts, inspections, refurbishment, as well as round-the-clock service agreements. As you have seen in the report, we have also this quarter been impacted by the continued uncertainty among our customers and the product-driven nature of our business with long delivery times or lead times. However, our underlying market remains strong, driven by the need to reduce greenhouse gas emissions, improve port environments, and increase customer efficiency. This. This, in turn, is driven by the strong megatrend to electrify society, which we are all aware of.
At the same time, we have seen an increasing global awareness to reduce noise levels in, for example, ports. Over 50 years, we have built strong expertise and experience in these areas and have a strong and attractive offering based on leading technologies.
This gives us the ability to grow with both new and existing customers, thereby expanding our installed base. The installed base, of course, is important because it provides us with an opportunity to offer our comprehensive range of service activities. Looking into some of the figures before I hand over a little bit later on to Joakim to explain a little more in detail. Order intake increased by 0.5 percent to €36.3 million in the quarter, driven by the demand for shore power and more mooring systems.
Our order backlog increased 14% to €126 million, reflecting the order intake in ports and maritime. We have had very long lead times in the product business.
We have continued to receive a range of significant orders over the past ten months. Maritime is important for our business. However, this is a product-driven business and most of the deliveries will not start until next year.
Revenue decreased slightly to €18.8 million, with an 18.8% decline to €35.8 million. Due to this, certain delays in planned deliveries of shore power systems, a shift in delivery plans for the customer, lower volumes due to the ports and maritime long lead times, and continuing caution among certain customers have led to us reporting a slightly negative EBIT this quarter. Before moving on, I would like to point out the improved profitability in the industry segment.
I will work within the industry to increase our market presence. Attracting new customers has led to more opportunities for us that we are very hopeful about going forward. In industry, the businesses consist of many smaller but recurring orders, which balance the port's maritime product-driven business. We have recently communicated several significant orders for Shore power systems. Two orders with a total value of €9.35 million include shore power systems for a new build and existing container vessels.
The customer is a leading global container shipping company that earlier this year signed an order for €8.1 million for shore power. This is a good mark of our delivery and product quality with a leading player in the industry, which gives us increased confidence. A large part of the latest orders involves retrofitting of shore power systems on existing vessels. This means that we will install our solutions on the vessels while they are operating between Asia, America, and Europe. They could either be in dry dock, or we can do it during the sailing. These are without doubt challenging projects that require a lot of logistics and technical know-how. We are proud to have the competence and experience to be able to do so. Deliveries will continue throughout 2026.
The second agreement we have communicated involves the delivery of the first shore power systems in the Maldives. We expect the system to become an important reference in the region and may create opportunities for more projects in the nearby areas in South Asia.
We will begin deliveries of this equipment in the first quarter of 2026. We have also recently announced an order with the construction and engineering company Civmec for a motorised cable reel for installations in Port Hedland in Western Australia, which is one of the world's largest iron ore export ports. This is a significant agreement, and it's our first major collaboration with Civmec, strengthening our presence in Australia. Mining and bulk handling sector. The delivery schedule for the third quarter in 2026.
With this, I will hand over to you, Joakim, for a deeper dive into the financial figures.