Privacy preferences
Inderes uses cookies to provide a better user experience and a personalised service. By consenting to the use of cookies, we can develop an even better service and will be able to provide content that is interesting to you.
  • Forum
  • Stock Markets
    • MarketsLive prices, indices, and market performance
    • Stock CalendarUpcoming earnings, listings, and corporate events
    • Dividends CalendarFuture and past dividends
  • Companies
    • CompaniesBrowse and filter the full list of listed companies
    • DiscoveryInspiration for your next investment
    • IPOsNew listings and upcoming public offerings
    • AGM InvitationsAnnual general meeting dates and shareholder info
  • Stock Research
    • ResearchExpert stock analysis and recommendations
    • ArticlesNews, insights, and market commentary
    • inderesTVVideo hub for stock research, analysis, and expert commentary
    • TranscriptsFull text records of earnings calls and investor meetings
    • Stock ComparisonCompare financials and performance across multiple stocks
    • Earnings SeasonCompare EPS estimates to reported results
    • Compound Interest CalculatorSee how your savings grow with the power of compound interest.
Find us on social media
  • Inderes Forum
  • Youtube
  • Facebook
  • X (Twitter)
Get in touch
  • info@hcandersencapital.dk
  • Bredgade 23B, 2. sal
    1260 København K
Inderes
  • About us
  • Our team
  • Careers
  • Inderes as an investment
  • Services for listed companies
Our platform
  • FAQ
  • Terms of service
  • Privacy policy
  • Disclaimer

Inderes’ Disclaimer can be found here. Detailed information about each share actively monitored by Inderes is available on the company-specific pages on Inderes’ website. © Inderes Oyj. All rights reserved.

Skanska to expand traffic corridor in Del Mar, California, USA, for USD 57M, about SEK 530M

SKA BPress release02.09.2026, 07.30

Skanska has signed a contract with the City of San Diego for the El Camino Real Half Mile to Via De La Valle Project in Del Mar, California, USA. The contract is worth USD 57M, about SEK 530M, which will be included in the US order bookings for the third quarter of 2026.

The project will expand the heavily traveled corridor by widening El Camino Real to four lanes and replace the existing 84-year-old San Dieguito River Bridge. Construction will improve drainage infrastructure and reduce flooding risks while protecting the corridor from future erosion along the San Dieguito River. Riverbank stabilization improvements will further strengthen the corridor's long-term resilience.

The project scope will introduce a range of upgrades, such as separated bike lanes, new sidewalks, improved traffic signaling and an equestrian-friendly trail beneath the new bridge. Together, these improvements will enhance mobility and safety for motorists, cyclists, pedestrians, and equestrians while providing a more reliable connection between Del Mar, Solana Beach and surrounding communities.

Work is slated to begin in December 2026 and is expected to reach completion in August 2030.