Copyright © Inderes 2011 - present. All rights reserved.
  • Latest
  • Markets
    • Stock Comparison
    • Financial Calendar
    • Dividends Calendar
    • Research
    • Articles
    • Transcripts
    • AGM Invitations
    • IPOs
  • inderesTV
  • Forum
  • Discovery
  • About Us
    • Our Coverage
    • Team
Regulatory press release

OKEA ASA - Increased recoverable resource estimates from the Talisker West discoveries at the Brage field (PL 055)

OKEA
Download the release


(Trondheim, 25 March 2026) - Reference is made to stock exchange notice dated 25 August 2025 with regards to the Talisker West discovery. Through further subsurface maturation of the Talisker Statfjord formation, recoverable resource estimates (P50) have increased from 19 to 28 million barrels of oil equivalents (mmboe). The development plan remains unchanged, and with the increase in volumes, expected break-even cost is less than USD 10 per barrel. Production is expected already in 2027.

Total recoverable volume estimates from Statfjord and Cook formations combined have increased from 16 - 33 to 23 - 44 mmboe.

The discovered volumes at Talisker West represent highly attractive, low-cost barrels that can be developed efficiently and brought on stream rapidly. With drilling and production handled directly from the Brage platform, the development concept is both capital-efficient and robust. First oil is expected already in 2027. The additional volumes will further enhance value generation from the discoveries and from Brage, with an expected break-even cost below USD 10/boe.

The Talisker West discovery is located in the North Sea, at the Brage field, 10km east of the Oseberg field and about 120km west of Bergen. The wellbore was drilled with the drilling rig onboard the Brage platform to measured depth of 10,223 meters.

The partners in the licence are OKEA ASA (operator, 35.2000%), Lime Petroleum AS (33.8434%), DNO Norge AS (14.2567%), Petrolia NOCO AS (12.2575%) and M Vest Energy AS (4.4424%).

This information is considered to be inside information pursuant to Regulation EU 596/2014 (MAR) and is subject to the disclosure requirements pursuant to MAR article 17 and section 5-12 of the Norwegian Securities Trading Act. The information was submitted for publication by Stig Hognestad, VP Investor Relations, 25 March 2026 at 07:00 CET. 

 

Find us on social media
  • Inderes Forum
  • Youtube
  • Facebook
  • X (Twitter)
Get in touch
  • info@hcandersencapital.dk
  • Bredgade 23B, 2. sal
    1260 København K
Inderes
  • About us
  • Our team
  • Careers
  • Inderes as an investment
  • Services for listed companies
Our platform
  • FAQ
  • Terms of service
  • Privacy policy
  • Disclaimer
Inderes’ Disclaimer can be found here. Detailed information about each share actively monitored by Inderes is available on the company-specific pages on Inderes’ website. © Inderes Oyj. All rights reserved.