Privacy preferences
Inderes uses cookies to provide a better user experience and a personalised service. By consenting to the use of cookies, we can develop an even better service and will be able to provide content that is interesting to you.
  • Forum
  • Stock Markets
    • MarketsLive prices, indices, and market performance
    • Stock CalendarUpcoming earnings, listings, and corporate events
    • Dividends CalendarFuture and past dividends
  • Companies
    • CompaniesBrowse and filter the full list of listed companies
    • DiscoveryInspiration for your next investment
    • IPOsNew listings and upcoming public offerings
    • AGM InvitationsAnnual general meeting dates and shareholder info
  • Stock Research
    • ResearchExpert stock analysis and recommendations
    • ArticlesNews, insights, and market commentary
    • inderesTVVideo hub for stock research, analysis, and expert commentary
    • TranscriptsFull text records of earnings calls and investor meetings
    • Stock ComparisonCompare financials and performance across multiple stocks
    • Earnings SeasonCompare EPS estimates to reported results
    • Short SellingSee which listed companies have disclosed short interest
    • Compound Interest CalculatorSee how your savings grow with the power of compound interest.
Find us on social media
  • Inderes Forum
  • Youtube
  • Facebook
  • X (Twitter)
Get in touch
  • info@hcandersencapital.dk
  • Bredgade 23B, 2. sal
    1260 København K
Inderes
  • About us
  • Our team
  • Careers
  • Inderes as an investment
  • Services for listed companies
Our platform
  • FAQ
  • Terms of service
  • Privacy policy
  • Disclaimer

Inderes’ Disclaimer can be found here. Detailed information about each share actively monitored by Inderes is available on the company-specific pages on Inderes’ website. © Inderes Oyj. All rights reserved.

Aker Solutions ASA: Aker Solutions receives letter of intent for Statfjord A recycling

AKSORegulatory press release17.11.2026, 08.00
Read the release

November 17, 2026 - Aker Solutions has received a letter of intent (LOI) from Allseas for the reception, dismantling and recycling of the topside from Equinor's Statfjord A platform in the North Sea. The platform was originally built at Stord in the 1970s and will now return to the yard to complete its life cycle.

Statfjord A is one of the most significant installations in Norway's oil and gas history. The topside was originally constructed at Stord in 1975 and prepared for installation on the concrete gravity base structure in 1976. Since then, the platform has been an important contributor to production from the Statfjord field, one of the largest oil fields ever developed in the North Sea.

As the original builder of the topside, Aker Solutions has detailed knowledge of the structure and extensive experience in maintenance, modification and life-extension work carried out over several decades.

"Statfjord A has played an important role in Norway's energy history for almost half a century. We are proud that Allseas and end-client Equinor have selected Aker Solutions to handle the final phase of the topside's life cycle. The award confirms the strong position we have built in decommissioning and recycling through decades of efficient project execution," says Guro Rausand, Executive Vice President for New Build at Aker Solutions.

The LOI covers disposal related preparatory work, reception, dismantling and recycling of the approximately 50,000-tonne topside following offshore removal by Allseas' heavy-lift vessel Pioneering Spirit.

Statfjord A is expected to arrive at Aker Solutions' decommissioning facility at Stord between 2029 and 2031. Following arrival, the dismantling and recycling campaign is expected to take approximately two years. At peak, the project is expected to involve approximately 100 personnel at the Stord yard.

"Our decommissioning team has extensive experience in complex offshore decommissioning projects. Combined with our specialized decommissioning facility at Stord, this gives us a strong foundation for carrying out the work safely, efficiently and with a high degree of material recovery," says Rausand.

Upon final contract award, Aker Solutions expects to book the above-mentioned sizeable1 contract as order intake in the fourth quarter of 2026 in the Renewables and Field Development segment.

1Aker Solutions defines a 'sizeable' contract as being worth between NOK 0.5 billion and NOK 1.5 billion.

ENDS