Copyright © Inderes 2011 - present. All rights reserved.
  • Latest
  • Markets
    • Stock Comparison
    • Financial Calendar
    • Dividends Calendar
    • Research
    • Articles
    • Transcripts
  • inderesTV
  • Forum
  • About Us
    • Our Coverage
    • Team
Press release

FLS wins order to supply key comminution technologies to a greenfield copper concentrator in South America

FLSmidth & Co.

PRESS RELEASE 
FLSmidth & Co. A/S
18 December 2026
Copenhagen, Denmark


Leading mineral processing technology and service provider, FLS, has received an order to supply key comminution technologies to a greenfield copper concentrator in South America.

The order includes the delivery of a 1600 x 2400 TSU gyratory crusher, two Rapture 900 cone crushers, two 34-foot diameter x 24-foot-long dual pinion SAG mills, two 24-foot diameter x 38.5-foot-long dual pinion ball mills and two clusters of gMAX cyclones. The order is valued at approximately DKK 405 million and was booked in Q4 2025. The equipment is expected to be delivered during 2027.

“This order further cements FLS’s market-leading position within key comminution technologies and our proven track record in the South American mining market. We are very excited to work with the customer and to supply equipment for this world-class greenfield copper concentrator,” comments Julian Soles, Products Business Line President at FLS.

Learn more about FLS’s market-leading comminution technologies at https://fls.com/en/equipment/crushing and at https://fls.com/en/equipment/grinding


Contacts:

Media
Jannick Denholt, +45 21 69 66 57, jli@flsmidth.com

Investor Relations
Andreas Holkjær, +45 24 85 03 84, andh@flsmidth.com
Jannick Denholt, +45 21 69 66 57, jli@flsmidth.com


About FLSmidth

FLSmidth is a full flowsheet technology and service supplier to the global mining industry. We enable our customers to improve performance, lower operating costs and reduce environmental impact. MissionZero is our sustainability ambition towards zero emissions in mining by 2030. We work within fully validated Science-Based Targets, have a clear commitment to improving the sustainability performance of the global mining industry and aim to become carbon neutral in our own operations by 2030. www.fls.com

Attachment

  • FLSmidth Press Release South America copper order

Find us on social media
  • Inderes Forum
  • Youtube
  • Facebook
  • X (Twitter)
Get in touch
  • info@hcandersencapital.dk
  • Bredgade 23B, 2. sal
    1260 København K
Inderes
  • About us
  • Our team
  • Careers
  • Inderes as an investment
  • Services for listed companies
Our platform
  • FAQ
  • Terms of service
  • Privacy policy
  • Disclaimer
Inderes’ Disclaimer can be found here. Detailed information about each share actively monitored by Inderes is available on the company-specific pages on Inderes’ website. © Inderes Oyj. All rights reserved.